Skip to main content

Auckland Hospital CDU

Auckland Hospital CDU

MacDonald Industries

MacDonald Industries logo
  • 289.4K profile views
  • 19 saves
Visit Website
Project: Refurbished an existing shell space on Level 2 of Auckland Hospital to create the Clinical Decision Unit. Read more
Visit Website

Refurbishment of Auckland Hospital's Clinical Decision Unit to enhance patient care and alleviate pressure on emergency services, featuring advanced water control solutions for hygiene and safety.

Project: Refurbished an existing shell space on Level 2 of Auckland Hospital to create the Clinical Decision Unit.
Sector: Public Healthcare
Location: 2 Park Road, Grafton, Auckland, New Zealand
Client: ADHB
Architect: Klein
Building Contractor: Argon Construction
Plumber: Chenery
Project complete: 2018

Auckland Hospital underwent a major refurbishment to create the new Clinical Decision Unit. This 24-bed ward is used to relieve pressure on the Emergency Department, Short Stay Unit and Assessment and Planning Unit. This facility was designed by Klein Architects and construction was carried out by Argon Construction.

MacDonald Industries were selected to collaborate on this project and specified Zurn water controls and Delabie taps and mixers to the enclosed bedrooms, bed bays, procedure room and bathrooms.

MacDonald Industries technical consultants have specialist knowledge in working with healthcare facilities and were able to select the most suitable water control products for this project.

Hygiene is an essential aspect in the hospital environment as well as patient comfort, safety, ease of maintenance and servicing. Delabie water control products were able to meet the challenges posed by this project. Delabie specialist range of infection control taps and mixers prevent the build-up of bacteria that can develop in the network and also at the point-of-use itself.

6332h 36m

Like this Project?
Hire MacDonald Industries

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Central Energy Trust Arena | Palmerston North