Karekare Beach Residence

Karekare Beach Residence

GWE Consulting Engineers

GWE Consulting Engineers logo
  • 7.0K profile views
  • 1 save
Visit Website
Client: Private Location: Karekare Beach, Auckland Project Value: Undisclosed Sector: Residential, 3 Waters Completion: 2021 PROJECT DESCRIPTION A steep site (30-35°) on sand does not typically constitute a viable building site. Read more
Visit Website

Innovative sand dune stabilisation and foundation design for a residential project at Karekare Beach, ensuring structural integrity and environmental protection.

Client:                      Private
Location:                Karekare Beach, Auckland
Project Value:       Undisclosed
Sector: Residential, 3 Waters
Completion:          2021

PROJECT DESCRIPTION

A steep site (30-35°) on sand does not typically constitute a viable building site.  The challenge was to determine a suitable foundation system for the site which included depths of loose sand in the order of 10 m in places.

GWE carried out a series of hand auger and machine drilled boreholes in conjunction with detailed slope stability analysis to inform foundation and slope stabilization design.  A deep foundation system with tie backs to provide adequate resistance against lateral loads was selected.  The resulting design was confirmed by the structural engineer implementing micropiles, up to 12 m long, that extended

into rock.  The design was externally peer reviewed and approved by Council prior to Building Consent being issued.

In addition to the micropile foundation/tie back system, continuously advanced and cemented retaining walls were constructed along the upslope of the development to protect the neighbouring property.

SERVICES PROVIDED

  • Geotechnical site investigation, on-site wastewater/ stormwater design and management.
  • Geotechnical design analysis to confirm stabilisation options.
  • Earthworks and micropile foundation and tieback installation supervision.
  • Geotechnical design checks during construction monitoring.
  • Coordination with designers site builder and micropile/tieback contractor.