Full revamp of the fuels system & surfaces. Read more
Visit Website

Comprehensive overhaul of the fuel system and surfaces, including trenching for new fuel and electrical lines, installation of a stormwater drainage system, and preparation for new fuel tanks and asphalt forecourts.

Full revamp of the fuels system & surfaces.

Our Civil Earthworks & Drainage scope consisted of uplifting the existing forecourt, trenching for new fuel & electrical lines, new stormwater drainage system including installation of interceptor traps & surface catchment, soft excavations around existing fuel tanks for removal & prep for new Fuel tanks and surface prep ready for new forecourts and asphalt.

2740h 20m

Like this Project?
Hire Frontline Group

Professional Reviews

1 / 5

“SiteCare contracted Frontline to complete all civil and drainage works for Exxon Mobil over the 18-week schedule. The client has a huge focus on HSE and strict specification compliance. Frontline took these requirements in their stride - working to a level not seen within the New Zealand construction industry. Frontline excelled and with the guidance from managing director Sean Gibbons, their attitude could not be faulted while they adhered to all Exxon Mobil’s internal expectations”