Skip to main content

Mt Albert Ped Bridge

New Zealand Consulting Engineers logo
  • 14.5K profile views
  • 2 saves
Visit Website
Detailed seismic assessment (DSA) of three connected structures consisting of a pedestrian bridge, a lift tower and an external concrete stair were completed by NZCEL for Auckland Transport. Read more
Visit Website

Detailed seismic assessment of the Mt Albert Pedestrian Bridge, lift tower, and external concrete stair, completed by NZCEL for Auckland Transport, ensuring compliance with current seismic guidelines.

Detailed seismic assessment (DSA) of three connected structures consisting of a pedestrian bridge, a lift tower and an external concrete stair were completed by NZCEL for Auckland Transport. Each building was modelled separately in ETABS and the %NBS of the structures were then calculated following the current seismic guidelines.

Completed
2023
Client
Auckland Transport
1010h 19m

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Remuera Signal Box and Ticket Building