New road construction and resurfacing need different preparation, so roading contractors’ experience should match the work your project involves.Can't find it? Describe what you need and matching suppliers will come to you.
Roading Contractors
Nothing matches those filters
Try widening one of them, or start again with the whole category.
Clear filtersLearn about Roading Contractors
The work of roading contractors depends on what sits beneath the finished surface as much as the surface itself. Heavy vehicle access calls for a pavement designed around its loads, while a resurfacing job needs an assessment of the existing base. Establish how water will leave the pavement and whether damaged sections need excavation rather than another layer over the top before specifying asphalt or concrete.
Roading Contractors
A roading contractor's quote should distinguish excavation and base preparation from surfacing, with clear responsibility for drainage connections. Staging on an occupied site also affects how deliveries and everyday traffic can continue during the works. Connections to public roads in Australia may require approval from the relevant road authority; confirm who will obtain that approval and arrange any required traffic management.
When is ground testing needed?
Ask the project engineer whether testing is needed to establish soil strength and pavement thickness. Allow for investigation before finalising the construction scope if soft ground or uncontrolled fill is suspected.
How should asphalt and concrete be compared?
Compare each option against the expected vehicle loads and turning movements, rather than appearance alone. Asphalt and concrete require different pavement designs, so have the proposed specification checked for the site's use.
What should be included in the handover?
Request the specified test results and records of any changes to the approved design. Check that drainage outlets are clear and agree how defects will be reported after completion.