Excavating Contractors

Excavating contractors handle foundations, drainage trenches and site cuts for residential and commercial building projects.

Can't find it? Describe what you need and matching suppliers will come to you.

Learn about Excavating Contractors

The scope of an excavation quote should match the levels shown on the drawings, including any allowance for material beneath the finished surface. Quotes from excavating contractors should clearly distinguish between digging and removing spoil. A foundation excavation can also require temporary access for machinery, so the work area may extend beyond the building footprint.

Excavating Contractors

An excavation contractor working in Australia can use Before You Dig records to help identify underground services before arranging on-site locating. These records do not establish the exact position or depth of every service. Drainage trenching also needs coordination with the drainage installer: trench depth and working space should suit the pipework and its specified bedding.

How much access does an excavator need?

Restricted access may require a smaller machine and a different method of removing soil. The contractor needs the narrowest entry width and details of overhead obstructions so they can assess suitable equipment.

What happens if rock is found during excavation?

Rock may require breaking equipment and change the time needed to reach the specified level. A written allowance or agreed rate for rock excavation should be obtained before the quote is accepted.

Can excavated soil be reused on site?

Suitable material may be retained for landscaping or fill, subject to the project specifications and any required testing. Soil intended for structural fill needs assessment rather than being treated as interchangeable with garden soil.