Project team
Hilton Haulage: A 4141m² warehouse with a 1740m² lean-to, featuring six loading docks, high-speed roller doors, and fire-rated walls, designed to meet MPI food storage regulations and enhance safety and efficiency in loading operations.
We have undertaken a project for Hilton Haulage that was required to meet MPI food storage regulations. It is a 4141m² warehouse with a 1740m² lean-to on the side for unloading containers through six Loading Docks. The warehouse has a knee height of 10.7m, and an apex height of 12.6m and a maximum storage height of 7.5m. A partition wall separates the warehouse and the lean-to which has three high speed roller doors. These doors are designed to open on fire alarm activation for the release of smoke during a fire. The fire rated walls ensure the protection of neighbouring property. These were all designed to protect loading areas, increase safety and improve loading area efficiencies.
Like this Project?
Hire Enlightened Fire Solutions
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Enlightened Fire Solutions
Other work by Enlightened Fire Solutions, across every category they build in.
More in
Commercial
Everything else in Commercial, from every practice on ArchiPro.
Next Project
Keep scrolling























