Liz van Welie Aquatics Centre features innovative swimming facilities with unique MagnaPool technology, encompassing two pools, a reception area, and office spaces, all designed within a tight construction schedule and strict specifications.
THE PROJECT
The new Liz van Welie Aquatics Centre features a swimming facility and adjoining carpark. The unique swimming pools are the first of their kind to be used in commercial operation in New Zealand. It utilises the MagnaPool system, using Magnesium and Potassium, for water treatment. The building ground floor of 1000m2 accommodates two pools [12mx6m and 25mx15m], reception, offices, changing rooms and operational facilities. The mezzanine of 200 m2 provides additional office space and an elevated public viewing area. We were engaged to provide structural, geotechnical, fire and civil services.
THE CHALLENGE
Not only was there a tight construction programme to be met, the Natare stainless steel pool manufacturer had strict specification limitations on the backfill material surrounding the pools – no compaction of fill or heavy machinery was allowed adjacent the pools.
Size: 1,200 m2
Value: $4,000,000
Year completed: 2017
“Glue laminated portal frames with hidden epoxy grouted connections are a standout feature of the built space”
Like this Project?
Hire Kirk Roberts Consulting
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Kirk Roberts Consulting
Other work by Kirk Roberts Consulting, across every category they build in.
More in
Sports and Recreation
Everything else in Sports and Recreation, from every practice on ArchiPro.
Next Project
Keep scrolling