Project team
A meticulously designed remodelled wet room featuring custom niches and high-quality tile work, ensuring both aesthetic appeal and long-lasting durability.
This room was divided off as part of a entire first floor level of a house being reconfigured. It is an entire wet room from the step in. The multiple niches were set out for the tile plan. Details mattered to the designer / client all the way through and Colin fulfilled these carefully.
Good tile work can never be rushed, for the correct fixing standards, and aesthetic quality demands to be met - however the finished product then not only looks great - it lasts the test of time.
Like this Project?
Hire Colin Barber
Professional Reviews
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Colin Barber
Other work by Colin Barber, across every category they build in.
More in
Renovations
Everything else in Renovations, from every practice on ArchiPro.
Next Project
Keep scrolling






















