Case Study: Moving to modern

Written by

MAD Design

16 February 2023

 • 

3 min read

banner
In many ways, the boardroom is the jewel in the crown and offered us an opportunity to not only restore it to its original splendour, but to rejuvenate an aesthetically beautiful and authentic room.

EcoSmart Fire breathes new life into acclaimed art deco fireplace.

Celebrating its 80th anniversary this year, the magnificent Manchester Unity Building has a special place in the history of Melbourne and the hearts of its citizens. So when Dr. Kia Pajouhesh, managing director and principal dentist of Melbourne-based Smile Solutions and Chairman of the MUB Owner’s Corporation, took on the task of restoring this building to its original beauty, it was the beginning of a labour of love.

The building’s boardroom is considered to be the most intact Art Deco Boardroom anywhere in the world. It carries a separate heritage listing from the rest of the building, and far from being a redundant showpiece, it is a functioning boardroom.

In many ways, the boardroom is the jewel in the crown and offered us an opportunity to not only restore it to its original splendour, but to rejuvenate an aesthetically beautiful and authentic room." - Dr. Pajouhesh

Recreating the fireplace

The boardroom restoration was made easier by a number of features, such as the stunning fireplace, remaining intact, and the boardroom table in situ – primarily because previous developers were unable to move the almost six-metre Queensland maple cross-banded with rosewood table.

The magnificent indoor fireplace occupies a distinct nook in the boardroom and was originally built as a decorative feature without a chimney or any other means of extraction. The fireplace consists of an interior of white polished marble tiles, a mantel of carved marble, and a hearth of contracting pink veined marble. The grate and decorative glass stones were disposed of and a granite platform was installed. The only element missing was an actual fire.

The challenge was to find a live-burn fire system that could work within the physical constraints of the room and not challenge the heritage overlays.

An EcoSmart Fire was chosen because of its clean burn system and because it provides a vibrant flame without the need for flueing. The XL900 burner perfectly fitted the 1500mm fireplace opening and produces an animated flame that scales perfectly within a large fireplace setting.

A passionate collector of Art Deco, Dr. Pajouhesh had the perfect centrepiece for his fire – a hand-crafted bronze spelter, a bronze sculpture of Warrior Confronting Beast (circa 1932), the year the Manchester Unity building came to life.

The fireplace and bronze sculpture are situated below a display of religious icons to provide a ‘symbolism of life.’ A polished black granite plinth was custom-made to provide the platform for the ‘struggle’ of man versus beast, and a structure for the Ecosmart burner was discreetly inlaid into the stone behind the sculpture.

The installation of the burner was simple, and the result is an interplay between the two key elements that are both effective and dramatic.

Information

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.