By Resource Management Solutions
Problem – Residential development proposed partly outside the Metropolitan Urban Limit within an area not served by wastewater or stormwater infrastructure. The development needed to be integrated into the existing Kaukapakapa residential area, all without public notification or written approvals.
Solution – Propose carefully designed complete residential village development package with sensitive stormwater management/decentralised wastewater system with carefully integrated design package for each lot with specialist urban design/architect/engineering/ survey/legal input.
Benefits – Extremely successful full consented and developed residential village enhancing the existing historic Kaukapakapa Village area.
Managing Resource Consents + Town Planning
Resource Management Solutions Limited (RMS) is a resource consenting, town planning and resource management consultancy based in Auckland, New Zealand. For over 21 years we have been obtaining resource consents for clients across a broad spectrum of development types throughout New Zealand.
We manage resource consents from project inception to successful completion with our achievements speaking for themselves — exceeding a 98% success rate since 1996 with all but a few projects consented without notification. That is an achievement that we are extremely proud of in an RMA environment filled with uncertainty and one that reflects skills and experience developed over many years. It is this expertise and experience that we offer you.
We also undertake development due diligence, and represent and advise clients on all development related RMA planning matters.