Project team
Product Suppliers
Upgraded heating system for a premium aged care provider in Christchurch, enhancing reliability and efficiency through advanced controls and improved modulation, while also providing cooling capabilities to reduce overall running costs.
The client had an existing underfloor heating system which was driven by aging air to water heat pumps. The system wasn’t performing well and was unreliable at critical times. The system was designed with two much larger heat pumps, this designed required that quite often one heat pump was off and the other was short cycling because the load of the building was lower than what one unit on low modulation could provide. The revised design allowed a much wider modulating range both reducing running costs and increasing reliability. Moving to a more advanced control system also allowed the client to run the system in cooling mode during the summer, which greatly reduced the load on the air based cooling system - increasing the comfort and reducing the overall running costs.
undefinedLike this Project?
Hire Waterware
Professional Reviews
The products behind the project
One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Waterware
Other work by Waterware, across every category they build in.
More in
Retirement Villages
Everything else in Retirement Villages, from every practice on ArchiPro.
Next Project
Keep scrolling
























