Project team
- Space Design Architecture
- Murray McKean
Comprehensive workplace refurbishment for the University of Newcastle, enhancing collaboration and flexibility through an open plan design while minimizing disruption during construction.
Client:
University of Newcastle
Location:
Callaghan, NSW
Expertise:
Education, Workplace, Interiors
Photographer:
Murray McKean
ABOUT THE PROJECT
Infrastructure and Facilities Services is a complete workplace refurbishment project undertaken for The University of Newcastle, located on their Callaghan Campus. The design brief was to break down the physical barriers between not only previously separated business departments, but also remove divisions between management and staff, offering a complete open plan work environment in which to work.
The project has been designed to be staged, to ensure continuity of business activities during construction, reducing the need for relocation or disruption of work. Opening up the workplace meant that private meeting spaces and quiet rooms were interspersed throughout to allow privacy when required. Each workstation incorporated electric controlled height adjustment for sit/stand configurations to suit individual workspace needs. Infrastructure and Facilities Services has now formed the generic workplace model used throughout The University of Newcastle in a number of faculties and schools.
Like this Project?
Hire Space Design Architecture
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Space Design Architecture
Other work by Space Design Architecture, across every category they build in.
More in
Office
Everything else in Office, from every practice on ArchiPro.
Next Project
Keep scrolling




















