Skip to main content

Veterinary Clinics

Projects for veterinary clinics show how consultation rooms and treatment areas are arranged, with client circulation distinct from clinical work.

Can't find it? Describe what you need and matching suppliers will come to you.

Veterinary Clinics


Showing all 1 project in Veterinary Clinics. Can’t find what you’re looking for?

More to discover

Explore all project categories


About Veterinary Clinics projects

A review of a project such as Foreshore Vet by McShane Studio can start with the junctions between floors, walls and fixed joinery. These details in veterinary clinics need to support frequent cleaning without leaving gaps that collect dirt or moisture. Photographs can help assess the arrangement, but material specifications are needed to confirm compatibility with the practice’s disinfectants.

Veterinary Clinics

An existing tenancy needs a services assessment before its fit-out scope is fixed; Kippa-ring Veterinary Clinic by RJM Builders is among the built projects listed in this category. The proposed use needs to be checked against applicable National Construction Code provisions and local approval requirements in Australia. Locate existing drainage connections and confirm electrical capacity against the equipment schedule before committing to room positions, particularly where new pipework would require cutting into the slab.

How can a clinic control noise from animal holding areas?

Ask an acoustic consultant to assess the separation between holding areas and noise-sensitive rooms or neighbouring premises. Include doors and ventilation paths, since sound can bypass a wall through gaps or ducts.

What should be checked for animals with limited mobility?

Measure door clearances and turning space against the trolleys the practice uses. Allow room beside examination tables for staff to assist an animal without blocking the doorway.

Can a clinic stay open during a renovation?

Agree on a staged works plan with the builder before construction starts, including service shutdowns. Separate occupied clinical spaces from dust and construction access, and identify any procedures that need to move off site.