Apanui Linear Park banner

Parts of Whakatane are located in the lower Apanui Catchment area, and the area is generally flat, low-lying and subject to widespread flooding. The local streams have generally been piped or heavily modified, with the entire stormwater network being pumped into the tidal Whakatane River.

The Apanui Linear Park and adjacent park areas have been identified as providing a potential opportunity to improve the current flooding situation through the enhancement of primary infrastructure, overland flow paths and the provision of additional flood storage volumes. ARAL were commissioned to undertake a high-level study and test the project feasibility at Apanui.

ARAL developed a feasible concept design that not only provided significantly more storage than anticipated but also delivers additional project outcomes such as stream daylighting and restoration, improvements to pedestrians / shared use connectivity and the provision of additional amenity. The project will deliver environmental, amenity, cultural and social benefits to the local community.

The Apanui Stream concept includes native planting and increases ecological habitat through the daylighting and restoration of the historic streams through the parks. The concept also improves public amenity and active transport access through the provision of boardwalks, enhancing community connectivity. The concept design has been well received by Whakatane City Council and is currently out for public consultation before detailed design work commences.

Apanui Linear Park
Apanui Linear Park
Apanui Linear Park
Apanui Linear Park

Professionals used in
Apanui Linear Park

About the
Professional

AR & Associates is a high-end multidisciplinary surveying, civil and environmental engineering design consultancy, firmly founded on our core values of quality, respect, integrity and balance.  

With a team of senior surveyors, civil and environmental engineers working under the same roof, we offer an integrated approach to ensure that the various facets of our work are coordinated to achieve sustainable, technically optimal and cost efficient solutions. Included in this approach is the integration of Water Sensitive Design (WSD) and Low Impact Design (LID) philosophies with the planning and engineering elements of a project.  This unique approach delivers coherent, efficient and attractive results.

We focus on clear communication and the delivery of high quality work that meets project timelines and budgets while achieving the best results for our clients.  The structure of our organisation enables us to keep overhead costs down while creating greater project ownership, improved quality and value for money.

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.