Sherwin Street banner

The property at 1 Sherwin Street, Tauranga, was identified by Tauranga City Council (TCC) as a Depth X Velocity risk property due to the proximity of a 100yr ARI overland flow exceeding the acceptable limit for residential areas (0.4m2/s) and depths in excess of floor levels.

The local layout historically caused the overland flow to concentrate in front of the property in the Sherwin Street sag point before spilling over the berm into the section.

ARAL was engaged by TCC to carry out catchment and peak flow modelling in accordance with TCC’s Infrastructure Development Code, and to develop a range of design solutions to address the 100-year ARI DxV risk in addition to improving the existing stormwater infrastructure in the area.

The final solution involved a grated channel for the safe and effective conveyance of overland flow paths, and the upgrade of an existing 300mm piped outlet using CIPP means. This included the following works:

  • Cured In Place Pipe (CIPP) relining works
  • Replacement of existing retaining walls that run either side of the stormwater easement
  • Installation of a new concrete channel with grated cover and new drop manhole to outfall onto a rip-rap apron;
  • Reshaping of footpath, vehicle access and berm;
  • Construction of wall fronting 1 Sherwin Street

The project was successfully completed to the required timeframes and approved budgets for TCC.

Sherwin Street
Sherwin Street
Sherwin Street
Sherwin Street
Sherwin Street
Sherwin Street
Stormwater overflow - before channel installation

Professionals used in
Sherwin Street

About the
Professional

AR & Associates is a high-end multidisciplinary surveying, civil and environmental engineering design consultancy, firmly founded on our core values of quality, respect, integrity and balance.  

With a team of senior surveyors, civil and environmental engineers working under the same roof, we offer an integrated approach to ensure that the various facets of our work are coordinated to achieve sustainable, technically optimal and cost efficient solutions. Included in this approach is the integration of Water Sensitive Design (WSD) and Low Impact Design (LID) philosophies with the planning and engineering elements of a project.  This unique approach delivers coherent, efficient and attractive results.

We focus on clear communication and the delivery of high quality work that meets project timelines and budgets while achieving the best results for our clients.  The structure of our organisation enables us to keep overhead costs down while creating greater project ownership, improved quality and value for money.

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.