Skip to main content

Artarmon Project

Artarmon Project

Magico Constructions

Magico Constructions logo
  • 3.5K profile views
Visit Website
Main scope of works for the project involved a major uplift in the kitchen joinery and in creating an open-space for the living room. Read more
Visit Website

Alterations & Additions

Main scope of works for the project involved a major uplift in the kitchen joinery and in creating an open-space for the living room.

Construction involved demolition of an existing wall which separated the living room space from the dining room and kitchen.

The biggest challenges faced during this build was:

Discover of latent conditions

Delivery of Project Before the Christmas Break

Managing the construction budget

Discover of latent conditions We discovered after demolition stage that there was no existing insulation material within the gyprock walls and ceilings.

Magico Constructions absorbed the additional costs on the owner’s behalf in good faith as we could not have asked for better clients. Reason being that there was no price negotiation throughout the project and the owners were generous enough to consider increasing our builder margin for the project.

Delivery of Project Before the Christmas Break This project started just a few months before the Christmas Break.

Magico had to plan things out well in advance to ensure that site works would run efficiently in order for the project to be delivered right before the Christmas Break.

Even after encountering some latent conditions, the project was completed one day before schedule on the 20th of December.

Managing the Construction Budget Prior to commencement of works, we discussed in detail with the clients the overall construction budget for the project.

Upon completion of the project, the construction costs were kept well within budget. The only exception being that the owners wanted to upgrade the standards of the joinery works to include shaker doors, bar cabinet and upgraded fixtures.

Tangible Results for Our Clients Upon completion of the project, our client decided to rent out this house.

It took just one open house, with 19 interested parties, for them to receive 5 offers and for the property to be instantly leased out successfully.

We believe that the results speak for themselves.

Completed
2025
Building style
Contemporary
Client
Coco Lau and Stephen Lo
0h 1m

Like this Project?
Hire Magico Constructions

Professional Reviews

1 / 15

“I have worked with Winston Zhou in the delivery of a high quality and significant residential project for an exciting client. Winston is a builder who seeks to actively engage with the consultant team. He does not work remotely, he is a problem solver and wants to drive solutions that respects the designer’s intent in order not to compromise on the outcome. Winston brough to the project a wealth of experience across all aspects of the construction phase. Like all great builders he was always thinking three or four steps ahead. The end result was never out of his mind. I found Winston to be most passionate about his work and about achieving great outcomes for his Clients. He is a person of integrity, who has a strong work ethic and great personality that makes working with him a delight.”

Andrew Leuchars (Director of NBRS Architecture)

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Elizabeth Bay Project