Project team
Innovative design and build project featuring SIP panels, MAXRaft slab, and advanced ventilation systems, achieving impressive energy performance close to passive standards.
This was a CBG design and build project - a tricky build on a smaller site with an adjoining party wall to the neighbouring property. Another SIP panel, MAXRaft slab combination with a Smartvent balanced ventilation system and double glazed thermally broken joinery with high-performing Low E-glass. This house had a blower door test to check its performance reaching .66ach @ 50pa which is very close to passive standards of .6ach @ 50pa.
Like this Project?
Hire CBG Quality Construction
Professional Reviews
Professionals used in
this project
The practices and trades credited on this project.
More projects from
CBG Quality Construction
Other work by CBG Quality Construction, across every category they build in.
More in
Residential
Everything else in Residential, from every practice on ArchiPro.
Next Project
Keep scrolling

































