Skip to main content

Union Green

Union Green

Cuesko

Cuesko logo
  • 13.0K profile views
  • 1 save
Visit Website
The Union Green Development completed in 2021 comprises three blocks of four levels containing two-level townhouses and a 12-storey high-rise apartment building delivering 151 units ranging in size from studio to three-bedroom apartments. Read more
Visit Website

Union Green Development features three four-level blocks and a 12-storey high-rise, offering 151 residential units with stunning views, retail spaces, and a focus on green elements, including landscaped podiums and planter boxes.

The Union Green Development completed in 2021 comprises three blocks of four levels containing two-level townhouses and a 12-storey high-rise apartment building delivering 151 units ranging in size from studio to three-bedroom apartments.

The elevated position of the development allows stunning views from most of the terraces and apartments toward the northwest taking in Westhaven and the harbour bridge.

In addition to the apartments, retail units are provided to the ground floor on the podium level.

Parking is provided by two levels of basement carpark which incorporate a number of car stackers to optimise space.

Green elements were a key focus of the development with each dwelling having access to planting including continuous planter boxes to all levels of the apartment building. The buildings are also connected with an extensively landscaped podium which creates laneways through the site encouraging pedestrian access both on to and through the site.

  • Peddle Thorp Architects
  • BGT Structural Engineers
  • Dominion Constructors
7218h 54m

Like this Project?
Hire Cuesko

Professional Reviews

1 / 24

“The Christchurch Heritage Trust engaged Cuesko to oversee the costings for the Trust’s Trinity/Shands project. This is a combination of two Category 1 buildings listed by Heritage New Zealand, a reconstruction of a tower, and the addition of a new block for meeting rooms, toilet and kitchen facilities. Since Cuesko developed the concept estimate for the project the scope has developed and evolved into four major elements of work. This is an unusual and complex project as each of these elements comes with its own set of unique design features and heritage responsibilities which incorporate extremely innovative construction and repair strategies. Cuesko have the challenging task of managing the budget for each element separately and as the project evolves through the design stage, Cuesko have been imperative in providing the cost advice to support decision making. Due to new construction systems being continually researched and investigated, Eoin has tailored the cost planning document to be easily updated as new information becomes available. This allows the forecasted budget expenditure to be tracked and managed all while incorporating actual costs incurred from early works running on site concurrent with the design period. Eoin has shown great enthusiasm in this significant Christchurch heritage project and his efforts to keep the reports current with all changes has had a very positive impact on the PM’s ability to consult with other members of the design team.”

Dr Anna Crighton QSO JP | Chair, Christchurch Heritage Trust

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Library Lane