Skip to main content

Stations and Mixed-use Spaces

Transport hubs include stations and mixed-use spaces. Station architecture can bring passenger facilities and shops into one building.

Can't find it? Describe what you need and matching suppliers will come to you.

More to discover

Explore all project categories


About Stations and Mixed-use Spaces projects

Passenger access starts at the edge of the site, where footpaths meet boarding areas and changes in level. The brief for a bus facility such as Gympie Aquatic Centre Bus Station by ACE Architectural Panels should distinguish waiting space from the path to the vehicle. Rail projects, including Reservoir Station by Fairview, require the same distinction between places to pause and routes that must remain clear, with shelter considered along the journey rather than only at the entrance.

Stations and Mixed-use Spaces

A passenger lounge such as Qantas Lounge, Brisbane by Geyer Design needs a different spatial brief from a station concourse: seating and luggage must be accommodated without narrowing circulation. Shared facilities also need clear boundaries between public access and staff-only areas. The design team in Australia should establish the applicable National Construction Code provisions and transport accessibility requirements early, alongside the operator’s requirements for the facility.

How should stations and mixed-use spaces accommodate different operating hours?

Separate access to independently operated areas so closing one tenancy does not block a passenger route. Agree on responsibility for shared entrances and security before fixing the layout.

What matters when specifying finishes for passenger areas?

Check slip resistance and cleaning requirements against the intended use, particularly where rainwater may be tracked indoors. Specify components that can be repaired or replaced without lengthy closures.

What should a station refurbishment brief include?

Establish which services must remain operational during construction and identify temporary accessible routes. Confirm staging constraints with the operator before developing the design.