Client: University of Newcastle Location: Callaghan, NSW Expertise: Education, Commercial, Community Photographer: Murray McKean The Team: Architect: Leigh Richardson, Chris van Lint Builder: Richard Crookes Construction The Vision After 20 years of use, the Forum Aquatic Centre had reached the point where an upgrade was required to ensure that it would still be fit for use for another 20 years. Read more
Visit Website

Comprehensive refurbishment of the Forum Aquatic Centre at the University of Newcastle, enhancing sustainability, accessibility, and aesthetics for continued community use.

Client:

University of Newcastle

Location:

Callaghan, NSW

Expertise:

Education, Commercial, Community

Photographer:

Murray McKean

The Team:

Architect: Leigh Richardson, Chris van Lint
Builder: Richard Crookes Construction

The Vision

After 20 years of use, the Forum Aquatic Centre had reached the point where an upgrade was required to ensure that it would still be fit for use for another 20 years.

ABOUT THE PROJECT

SDA were first engaged to develop a master plan for the complex in 2019. With the closure of the pool for COVID, this project suddenly came online and SDA set about designing and documenting.

The project had a number of key focuses, including sustainability. Given the amount of energy used for heating the complex, sustainability was one of the key drivers of the upgrade. Double glazing was installed where possible and an energy efficient heating system was installed for water and air heating.

One of the most striking features of the pool was the replacement of the existing polycarbonate skylight with a double glazed glass roof measuring around 40m in length by 1.6m in width. This lets in a huge amount of light reducing the need for artificial lighting and further reducing energy use.

Accessibility was another main focus was the accessibility of the complex. A new ramp into the pool was installed to allow for wheelchair access along with  a new accessible toilet and shower facility and an adult change room.

Every surface in the complex was upgraded to ensure that the pool was given a refresh that would be visible by anyone who visits the venue. The entire pool was re-tiled along with the full concourse and walls. Carful attention was given to the amenities to create an environment that was light and bright in contrast with the previous amenities.

1340h 18m

Professionals used in
this project

The practices and trades credited on this project.

More in
Schools

Everything else in Schools, from every practice on ArchiPro.

Next Project

Keep scrolling
Zimple Digital Workplace