Auckland International Airport Plaza Canopies

By Fabric Structures

Profile
Auckland International Airport Plaza Canopies banner

The purpose of the project was to provide a great ‘pedestrian experience’ by providing a covered walkway from the airport terminal to the car parking area located north of Ray Emery Drive. This is happening because the main car park is being shutdown in order to build a multi story car park. It also had to provide a seamless transition to the rental vehicle pick up and drop off areas north of Ray Emery Drive.

This project was unique/complex because of the huge amount of services that run under the ground at the airport. These are major services that essentially run the airport so can’t be moved, therefore the design/engineering often had to work around or over the services, this meant their needed to be a huge amount of collaboration with both Beca (Civil Designers) and Fulton Hogan (Civil Contractors). The project also had to be delivered at a fast pace which meant both steel and PVC was fabricated off the 3D model so everything had to be correct to enable this to happen successfully.


There were also many other trades that had to be coordinated with like Wayfinding, Lighting and communications. This meant many team meetings involving up to 20 people a number of times a week, which resulted in a huge amount of communication and engineering changes required by our 2 x third party engineering companies.

The project exceeded the clients needs by providing an attractive walkway to the car parks north of Ray Emery Drive, it also provides a seamless transition for customers picking up there rental vehicles. We delivered the project over two lockdowns, which meant the termination of the original contract at March 2020, with the site getting locked down, then getting contracted again to finish stage 1 in January 2021 (enduring another lockdown over this period). This involved a huge amount of coordination and trust with AIA in a hugely disruptive period to work with them directly to get the project back on track post Covid lockdowns. This met the clients needs, building a strong rapport directly with the AIA team, resulting in their continued business at the airport.

From an engineering perspective, because of the huge amount of services under the ground, we first had to work with Beca to confirm the ‘most likely’ column set-out, then get our engineers to complete their engineering off this geometry (as opposed to putting a design together with uniform column spacings). This was a huge job in itself given the 300M of fabric structures. Our foundation engineer also had to end up designing 5 x different foundation options, giving Fulton Hogan options on site should they find services in the wrong place (which they did on a number of occasions).


From a management perspective, because of the size of the project and the speed at which it originally had to be delivered (pre Covid), we had to get some of the PVC panels fabricated in the Phillippines, which added another layer to the management and communication required.


Also, because the first contract was terminated over the first March 2020 lockdown, the original AIA team no longer worked there, meaning we had to manage and effectively educate a new team on what had gone on before and the reasons for certain decision at the time, which again added more work to the already large project.

This project was both huge in size and complexity, it required years of stakeholder engagement to make it a success. From the initial column set-out to try and mitigate the huge amount of services underground, to engineering the 4 x non-uniform structures, engineering 5 x foundation options, management of multiple stakeholders/trades, 2 x covid lockdowns, leading to termination of the initial contract, then managing/educating a new AIA team and contract. Finishing this project ending up taking 2.5 years.

Fabric Structures

Products used in
Auckland International Airport Plaza Canopies

Professionals used in
Auckland International Airport Plaza Canopies

About the
Professional

Fabric Structures Ltd specialises in the design and fabrication of bespoke architectural and event structures. We provide internal and external expertise on a wide range of materials including PVC - solid, PVC - mesh, Metal Mesh, PTFE & ETFE. We are also the local distributors for a range of architectural membrane products.

From fixed frame canopies, cable tensioned structures, insulated enclosures and facades, we deliver fabric solutions for commercial buildings, aquatic centres, outdoor sport and recreation spaces, events and exhibitions, across a range of sectors.

Our highly-skilled, multidisciplinary team (based across two sites in Whangarei and West Auckland), provides expertise across every aspect of production, from a technical understanding of specialist textiles, best practice design/engineering processes, building consent applications, through to project delivery.

Innovation is at the heart of our culture, demonstrated through our award-winning bespoke local and international solutions, ranging from purpose-built architect-led solutions to internal design-led fabric structures and facades.

At Fabric Structures, we collaborate with other industry-leading experts, including architects, specialist tensile engineers, leading fabric suppliers, steel fabricators, local civil contractors and professional riggers.

"Big enough to execute with excellence, but small enough to know you."

We build sustainable working relationships with our clients, collaborating closely with them to understand their needs and issues so that we can provide the best solutions.

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.