Skip to main content

Edge 28

Walsc AAC Panel Systems logo
  • 29.5K profile views
  • 1 save
Visit Website
The Edge 28 project, completed in 2020, exemplifies innovative construction within a vibrant mixed-use space. Read more
Visit Website

A high-performance internal wall system that seamlessly integrates with the building’s dynamic design

The Edge 28 project, completed in 2020, exemplifies innovative construction within a vibrant mixed-use space. 

The 65-metre tower, comprising of 77 residential apartments and 4 floors of commercial space, is in the centre of the Wollongong CBD, one of Australia’s most liveable and vibrant regional cities.

Walsc AAC Panel Systems played a key role in delivering a high-performance internal wall system that seamlessly integrates with the building’s dynamic design. The system was carefully selected to enhance both thermal and acoustic comfort, ensuring a superior environment for residents and commercial tenants alike.

Completed
2020
1580h 0m

Professional Reviews

1 / 4

“You feel the difference the moment you walk in - the quiet, the steady temperature, the solid walls underfoot. And the build went up faster than we thought possible.”

Project builder Latitude - Liverpool, NSW

The products behind the project

One product specified into this build from one supplier, a verified ArchiPro member. Tap through to specifications, suppliers and lead times.

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Koi Town Centre, Burwood