Contemporary fitout for Skein Sisters, a vibrant knitting hub in Dulwich Hill, featuring robust design elements and a welcoming atmosphere, completed in 2018.
Location
New Canterbury Road, Dulwich Hill
CategoryCommercial
About This Project
The partners of this new business enterprise briefed us with a detailed discussion as to why they were undertaking such a venture. It was to provide a home for knitters where they could not only buy fabulous yarn not available in Sydney, but more to provide a home inclusive of the knitting fraternity.
We loved their energy and mission statement so much that we just had to give them a physical space worthy of their venture.
The selected building is leased, but required extensive repairs and remodelling including fire rated ceilings, new wiring and new flooring.
Out of the leftover money, which wasn’t much, we had to design a fitout which didn’t talk down to the clientele with shabby chic lime washed interiors, but one that was far more robust and contemporary to embrace and acknowledge the sophistication of this community.
We used cheap materials, mainly plywood, and pine ply box units to enable the interior fitout to not only be hardwearing and cool, but we also came 10% under our very tight budget.
Our input was to design the layout, all joinery, bespoke tables, restoration items, lighting design, colours and finishes (internally and externally), mechanical ventilation, bathroom and kitchens as well as exterior signage locations.
- Completed
- 2018
- Price range
- $0 - $0.25m
- Building style
- Contemporary
- Client
- Skein Sisters
Like this Project?
Hire Karmatecture
Professional Reviews
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Karmatecture
Other work by Karmatecture, across every category they build in.
More in
Retail
Everything else in Retail, from every practice on ArchiPro.
Next Project
Keep scrolling