Skip to main content

Te Karaka Boat Shed

Te Karaka Boat Shed

NAS Construction

NAS Construction logo
  • 5.8K profile views
  • 7 saves
Visit Website
This project was something very different… Building a pile foundation walkway, jetty and boat shed on Lake Rotoiti. Read more
Visit Website

Unique construction of a pile foundation walkway, jetty, and 64m2 boat shed on Lake Rotoiti, featuring black corrugated iron cladding, a spacious roller door, and marine ply interiors, all while adhering to D.O.C restrictions and council requirements.

This project was something very different…
Building a pile foundation walkway, jetty and boat shed on Lake Rotoiti.
It was a challenge building above water but also working to D.O.C restrictions and council requirements.

The 64m2 Boat shed is clad in Black corrugated iron and has a large 6m roller door for security.
Inside the shed there is a 1m walkway either side (leaving enough room for two boats) and the walls are lined with marine ply.
Smart lighting makes this a usable area day or night.

Photography: Nas Construction

1.3K3h 51m

Like this Project?
Hire NAS Construction

Professional Reviews

1 / 3

“I have just completed my amazing new home together with Nasconstruction The expert workmanship in every aspect of the build from start to finish and the stress free progress in which they managed left me free to enjoy every part of the build. I could not fault the total professionalism exhibited by this progressive building company and all the subcontractors that they recommended. No detail was to much for them to achieve other than 100% satisfaction for both themselves or myself. As I am a single lady I knew I was in the very best hands for an upfront quality build that was well within the projected budget costs. The building incorporated a brand new Sugi Japanese burnt brushed and oiled timber. Their innovative ideas have led to a truly wonderful home which I know they are justly proud of also. I would challenge any other building company to match this team to the high standard and skills this company has achieved. Sincere thanks Nick, Shaun and the team.”

Jane Davis

Professionals used in
this project

The practices and trades credited on this project.

Next Project

Keep scrolling
Beach Side Sugi