First-floor addition featuring 3 bedrooms and a large bathroom, alongside ground floor renovations for a master suite and updated entranceway, completed on time and within budget by our experienced team.
The first-floor addition includes 3 bedrooms, a large bathroom, a living room and walk-in linen.
Ground floor renovations included opening up the entranceway for the addition of a staircase and converting 2 smaller bedrooms to a master suite.
Facade upgrade using a modern colour palette.
Designed and constructed by our fully qualified and experienced team. Concept design, detailed scope of work and quote delivered in 2-3 week timeframe. Construction drawings produced and CDC approved ready for contracts in 2 months timeframe. Build completed within 4 months including a Christmas shutdown period. Concept design delivered on budget. Build delivered on time and within budget.
Photography: Grundy Media
Like this Project?
Hire Spannenberg & Son
Professional Reviews
Professionals used in
this project
The practices and trades credited on this project.
More projects from
Spannenberg & Son
Other work by Spannenberg & Son, across every category they build in.
More in
Renovations
Everything else in Renovations, from every practice on ArchiPro.
Next Project
Keep scrolling