Project team
- HB Architecture
- Sharon Mazey
Reconstruction of the Knoll Ridge CAT Shed following fire damage, completed in 2010, to restore essential facilities for winter operations at the Knoll Ridge level.
The original Knoll Ridge Cat Shed (along with three snow groomers and an excavator) was destroyed by a fire in February 2009, along with the original Knoll Ridge Chalet. The top terminal of the Waterfall Express Chair Lift was also partially damaged during the same period due to a separate fire. Unfortunately, neither the Chalet nor the Cat Shed could be reconstructed in time for the 2009 winter season and temporary facilities had to be constructed at the Knoll Ridge level.
- Completed
- 2010
- Building style
- Contemporary
Like this Project?
Hire HB Architecture
Professionals used in
this project
The practices and trades credited on this project.
More projects from
HB Architecture
Other work by HB Architecture, across every category they build in.
More in
Public and Cultural
Everything else in Public and Cultural, from every practice on ArchiPro.
Next Project
Keep scrolling

































