Rialto Regeneration banner

Rialto Towers Regeneration 

Studco offers an engineered solution for building high walls in an iconic tower. 

Rialto Towers is renowned as one of Melbourne’s most iconic buildings, with its famous blue glass façade in the city’s west-end; the stunning office tower has been home to some of the most successful businesses over the past 30 years.

"Studco HEDA Tough Wall System decreased installation time and simplified the build process"

Standing tall at an impressive 251 metres, this 30 year old building has been rejuvenated with the addition of a five-storey structure that wraps around its base and connects the two towers.

Architect Woods Bagot’s designed the regeneration to encapsulate the well-recognised blue glass facade that flows out to a grid shell glass canopy that is illuminated at night.

To entice the wider public into the lower levels of the building, the regeneration replicates the feel of an international airport terminal with architectural finishes, and features an informal meeting place that will be utilized for pop-ups, exhibitions, retail stores, food and beverage outlets, whilst boasting a rooftop entertainment area that will inject vibrancy into this recognisable landmark.

ARC Plastering engaged Studco Building Systems as their steel stud supplier of choice. After having worked with Studco’s technical services team on many highend projects, ARC Plastering knew they could turn to Studco for engineering advice. The project featured engineered baffles and bulkheads to support internal glazing and features, as well as internal walls of great heights. To ensure all elements of the design were met, contractors ARC Plastering sought out a partnership that could offer quality products and high level of service, including fast turnaround on technical enquiries, flexibility in design constraints and a reliable supply of products. The high walls required for the construction also required an engineering and product solution that would be able to handle the challenging demands of the structure.

Reaching heights of up to eight metres tall, the Studco technical team specified the HEDA Tough Wall System. Traditionally, wall openings require two or three studs at each side of the jamb and a series of stud and tracks to act as a lintel. However, the HEDA Tough Wall System uses fewer sections and provides a strong frame to confidently hold extreme walls.

The versatile Studco HEDA Tough Wall System was the ideal solution for constructing the high walls of the Rialto revamp for its simple and easy installation. By utilising fewer sections, the HEDA Tough Wall System decreased installation time and simplified the construction process for builders Built. Studco’s Engineering Team were available to assist with any technical questions to ensure the installation went smoothly, providing certified sign off and fast turnaround on any enquiries. Discover the difference of Studco’s service guarantee and learn what partnering with leaders in innovative building products can do for your project.

Architect: Woods Bagot

Developer: Exquisite

Builder: Built.

Contractor: ARC Plastering

EZ Concept

Professionals used in
Rialto Regeneration

About the
Professional

Manufactured by Studco Building Systems®, EZ Concept® are the innovators of the world-renowned EzyJamb® door jamb systems, offering an expanding range of architrave-free architectural finishing products to create modern interiors for residential, industrial and commercial spaces.

With our innovative line of products, we are here to help architects, interior designers, builders and developers achieve contemporary flush finished designs.

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.