Cheshire banner
Project by
Year of completion
2021

Restrictive legal constraints combined with challenging site topography and ground conditions drove a unique design response to an ambitious brief. The client wished to develop a small rear section on a Wellington hillside into a Passive House apartment and attached studio unit.

Location: Wellington

Project type: Apartment & studio

Certification: Passive House certification targeted

Construction:

  • Structure: Structural Insulated Panels
  • Windows: timber frame, triple glazed
  • Cladding: trapezoidal profile pre-painted steel
  • Services: Separate MVHR/HP-HWC
Energy Architecture
Wellington
Visit Website
DSC07283-gigapixel-standard-scale-200x.jpg
DSC07292-gigapixel-standard-scale-200x.jpg
DSC07179-gigapixel-standard-scale-200x.jpg
DSC07204-gigapixel-standard-scale-200x.jpg
DSC07181-gigapixel-standard-scale-200x.jpg
DSC07181-gigapixel-standard-scale-200x-v2.jpg
DSC07206-gigapixel-standard-scale-200x.jpg
DSC07195-gigapixel-standard-scale-200x.jpg
DSC07210-gigapixel-standard-scale-200x.jpg
UntitledPanorama-1-gigapixel-standard-scale-200x.jpg
DSC07259-gigapixel-standard-scale-200x.jpg

Professionals used in
Cheshire

About the
Professional

We create innovative architecture that centres the wellbeing of our clients and our shared environment

Architecture is about beauty, quality, performance & responsibility. Good design grows from a process that is driven by these values and embraces challenge.

We provide full architectural services from pre-design to completion. Our experience covers different scales, levels of complexity and particular client requirements. We embrace challenge, and have a proven track record in delivering high performance projects when working under difficult constraints.

For projects targeting Passive House, Low energy Building or EnerPHit certification. We can guide you through the requirements of this process.

At ArchiPro we recognise and acknowledge the existing, original and ancient connection Aboriginal and Torres Strait Islander peoples have to the lands and waterways across the Australian continent. We pay our respects to the elders past and present. We commit to working together to build a prosperous and inclusive Australia.